Lean Thinking In World Class
Manufacturing
Global competition is forcing world class manufacturing companies to practice
lean thinking. As the need for a new manufacturing strategy adds pressure to the decision making process, the
results can be very profitable!
Because of the incredibly low wages in developing countries, companies are forced to think lean or die. Many
long standing companies have gone by the wayside and closed forever because they were unwilling or unable to
adapt.
Yet some world class manufacturing companies have embraced lean thinking and are more profitable than
ever! A good example of this is Husky Injection Molding Systems Ltd., located in Bolton, Ontario, Canada.

My first encounter with Husky was as a plastic injection mold maker. I was an apprentice and my master was a man
who had previously worked for Husky. He was certainly the best mold maker I have ever worked with and he told me
many stories about Husky and how good they were at mold making.
Since that time I have seen and used their products on an almost daily basis and recognize the expertise and
quality. So it is no surprise that they have understood and embraced the lean manufacturing culture and mastered
it.
Recently they introduced a new hot runner system to the plastic injection molding industry, called PRONTO. A
hot runner system is a highly technical method of melting plastic raw material and
injecting it into a steel mold. This is how most of the plastic things you use on a daily basis are produced. It
is one of those things nobody thinks about or appreciates!
Husky is able to reduce leadtimes and costs, while maintaining their high standards of quality. They have
managed this by producing the component through a combination of standard parts, automated design practices and
lean manufacturing of custom plates and manifolds.
The two-week PRONTO systems resulted from Husky's systematic lean implementation, which included the
following steps:
- Cross functional teams reviewed the entire value stream from shipment of the product through to initial
order entry with a clear objective of reducing lead times to two weeks.
- Using Six Sigma tools, manufacturing times and variation at each step in the process was measured.
- Work balancing enabled improved flow and ensured constraint operations are effectively utilized.
- Non-value added tasks were eliminated.
- Standard work procedures were implemented to ensure consistency and flow.
- Visual cueing systems were created to ensure quick response to any flow impediments.
- From start to finish, each team coordinated their efforts to ensure consistent product flow at each handoff
point.
The 50 percent reduction in leadtime was achieved in less than three months, with no impact to
existing production or on time performance. This case study is an excellent example of lean thinking in world class
manufacturing. The intelligent use of value stream mapping paid off handsomely!
From the end-user perspective, this is a welcome change. In the past, each hot runner system was more or less
custom made for every application. By standardizing the system mold designers can more easily plan the design and
manufacture of injection molds. This cuts leadtimes and reduces costs, as well as making the job of the mold maker
easier.
Now you and your company can benefit from Bill’s business knowledge and
experiences. The bottom line is this. If your career and your company's bottom line are important, you will benefit
from Bill Gaw’s management coaching. Bill has helped hundreds of individuals and companies fulfill their vision and
meet their goals.
|